African governments hold stakes as small as 5 per cent in some of the Chinese-backed mines that are reshaping the continent’s critical-minerals map, and as high as a possible 25 per cent in others, according to a report that also finds no published terms for the transfer of technology.
The findings come from Development Reimagined, a consultancy whose October report was set out in detail by Ecofin Agency on 3 November 2026. The firm tracked 32 Chinese-backed mineral projects announced, signed, built, acquired or completed in 15 countries between the ninth Forum on China–Africa Cooperation in September 2024 and June 2026. The projects cover 16 minerals and metals and are worth a combined 41.2 billion dollars.
Guinea and Egypt, Ecofin reported, account for 76 per cent of that total. Nineteen of the projects involve processing or manufacturing and are worth 16.3 billion dollars. They represent 59 per cent of the projects but only 40 per cent of the investment value. Greenfield projects account for 87 per cent of the total value.
A single development dominates the arithmetic. Simandou, the 23-billion-dollar iron-ore project in Guinea involving Baowu’s Winning Consortium Simandou, Chinalco and Rio Tinto, accounts for 56 per cent of the total and includes more than 600 kilometres of railway and port facilities. Excluding Simandou, Ecofin calculated, the remaining 31 projects are worth 18.2 billion dollars, with processing accounting for about 90 per cent of that amount. Under Simandou’s co-development agreement, the partners must submit feasibility studies for either a 500,000-metric-ton steel mill or a 2-million-metric-ton pellet plant within two years of production starting.
The range of state ownership is the finding that travels. China Molybdenum’s 1.1-billion-dollar expansion at Kisanfu, in the Democratic Republic of the Congo, is expected to add 100,000 metric tons of copper a year from 2027. China Molybdenum holds 71.25 per cent, the battery maker CATL 23.75 per cent, and the Congolese government 5 per cent. According to the report, the state’s financial returns are limited to royalties and a minority share of dividends.
At the other end of the scale, Mali secured 10 per cent of the Goulamina lithium project with an option to increase its stake to 25 per cent. Tanzania retained at least a 16 per cent free carried interest and a 3 per cent royalty in Peak Rare Earths. Nigeria holds 15 per cent of the Aluminium Smelter Company of Nigeria. Zambia holds 20 per cent of the Luanshya copper mine. In Uganda, the investor holds the larger share of a 250-million-dollar gold mine. The gap between the Congo’s 5 per cent and Mali’s possible 25 per cent, the authors wrote, reflects national legislation more than the value of the project.
Ownership on paper is not the same as industrial capacity. Nigeria’s smelter, which has an annual capacity of 300,000 metric tons of aluminium, has been idle for more than a decade because of unreliable power, legal disputes and financial problems. China National Chemical Engineering signed a 1.2-billion-dollar contract to overhaul the gas plant linked to the facility. In Zambia, China Nonferrous Mining and state-owned ZCCM have invested more than 75 million dollars at Luanshya and plan to spend about 710 million dollars redeveloping Shaft 28.
Zimbabwe, the report found, has gone furthest in requiring local processing. It suspended exports of raw minerals and lithium concentrate in February 2026. Sinomine has announced a 400-million-dollar lithium smelter. Sichuan Yahua is building a 200-million-dollar lithium sulfate plant at Kamativi with a subsidiary of the state’s Mutapa Investment Fund, and Huayou Cobalt reported its first lithium salt exports in April 2026. A planned 800-million-dollar Tsingshan blast furnace at the Dinson steel plant would double annual steel capacity to about 1.2 million metric tons, in a country that imports about 1 billion dollars of steel a year. Processing bauxite into alumina, in a comparison cited by Ecofin, raises the price from about 32 dollars to 590 dollars a metric ton.
What is on the record is mostly jobs and equity, not engineering control. The documented commitments include about 300 jobs at Erkang’s lithium plant in Nigeria and about 4,000 at South Africa’s Orkney gold plant, refurbished for 11 million dollars before gold prices rose 52 per cent between November 2024 and June 2026, as well as a rule that at least 60 per cent of non-managerial jobs at Peak Rare Earths go to Tanzanians. Equity produces dividends and royalties produce revenue. Neither, the report argues, automatically transfers technical expertise.
Across the 32 projects, Development Reimagined found no published evidence of joint research, licensing agreements or local appointments to senior technical and management positions. The authors were careful not to overclaim. Many of the projects are recent, technical terms are rarely disclosed, and the absence of published evidence does not mean that no technology transfer is taking place.
Geological information is another gap. In the DRC, global surveys document production of at least nine green minerals, but reserve estimates are available for only three. Mozambique has produced at least eight, with public reserve data only for graphite and zirconium. A China-funded survey in Liberia, described as the country’s largest in 50 years, identified cobalt, lithium, neodymium, nickel, silver, uranium and zinc. The DRC has agreed to share geological data with China.
The authors recommend that African governments set minimum state-ownership requirements, agree ownership and revenue-sharing terms before projects begin, and tie export permits to local processing. They also call on Chinese investors to disclose the terms of their investments, and they urge African governments to agree common positions ahead of the tenth Forum on China–Africa Cooperation, expected in 2027.
The picture that emerges is not a simple story of plunder or of partnership. It is a ledger of large sums, thin published equity in some of the most valuable deposits, a growing push into processing, and a silence, in the public documents, about who will actually run the technology. Five per cent at Kisanfu and a possible 25 per cent at Goulamina are the markers on that ledger.

